Construction of the new APG Weinviertel 380 kV overhead line from the Seyring Node to Pole 68, with simultaneous demolition of the old 220 kV line between Bisamberg and Auersthal.
Renewal of the Nave-Concesio 132 kV line T.764-765 with replacement of the tower structures, transfer of the conductors from the old to the new support structures and replacement of the conductors and the ground wire.